3
07 - 2009
6
SERVICE OPERATIONS
35
6.1
DISASSEMBLY AND ASSEMBLY
35
6.2
CLEANING OF THE OPTIC SENSOR ON THE COIN EXIT
37
6.3
MECHANICAL CONFIGURATION OF THE CHANGE RETURN RANGE
38
6.4
ADJUSTING THE MAXIMUM AND MINIMUM LEVELS IN THE HOPPER
42
7
TOOLS
43
7.1
PROGRAMMING TOOLS.
43
7.1.1 HEUS user application
43
7.1.2 TL20 Tool
43
7.2
AZKOYEN SIMULATION TOOLS
44
7.2.1
Cctalk
Manager
44
8 NORMS
46