10
07 - 2009
Figure 3: Position of the level sensors
11)
Fill the hopper.
12)
Before connecting the machine to the mains, carry out a visual inspection to
determine that there is no interference with either the entry or exit of the coins.
13)
Switch on the mains power. The hopper will be ready to work. In the Parallel T3
hopper there is a status LED, in green, to indicate that there is no error that and it is
working normally.
Full sensors
Empty sensors