C - INSTALLATION
4 - INSTALLING THE SWITCHGEAR
The switchgear must be mounted to the post where the 230Vac power comes from.
•
To ensure proper operation of the motorisation, the length of the motor cables must not exceed 8 m per
motor. The cables must have sections of at least 1.5mm. Therefore, the switchgear must be mounted less
than 6m from each motor.
•
Use four screws and dowels to install and mount the switchgear in the defined location.
5 - INSTALLING THE FLASHING LIGHT
The flashing light must be fastened at the top of the post on which the switchgear is attached and must be
visible both inside and outside. Only use the light provided in the kit (24 V - 2 W).
The flashing light may be fastened on the wall with or without support.
• With a screwdriver, remove the transparent part of the flashing light by unscrewing the 2 screws that hold
the upper part of the flashing light.
• Still with a screwdriver, remove the flashing light bracket by unscrewing the 2 screws inside the light.
• Fasten the flashing light bracket to the wall (ignore this step if you are fastening the light directly to the wall).
• Run the wires into the flashing light and connect them to the LED lightbulb (maintaining the “+” and “-”
polarity).
• Screw the flashing light to its bracket and screw in the transparent part