Installing the Avaya S8700 Media Server with the G650 Media Gateway
Pre-installation setup
24
Installing the Avaya S8700 Media Server with an Avaya G650 Media Gateway
December 2003
•
Administrator’s Guide for the Avaya Communication Manager (555-233-506)—end-user
documentation that includes information on administering trunks and telephones.
•
Administration for Network Connectivity for the Avaya Communication Manager (555-233-
124)—documentation providing information on network connectivity.
•
Maintenance Commands Reference (555-245-101)—provides information on how to use
command interfaces, command syntax, and output from maintenance-related commands.
•
Maintenance Alarms Reference (555-245-102)—provides information on how to use alarms, error
codes, and tests to diagnose and repair problems.
•
Maintenance Procedures (555-233-103)—provides information on how to troubleshoot and
replace various components.
The following information is included in this installation procedure:
•
Pre-installation setup on page 24
•
High level overview of installation process on page 26
•
Downloading license and Avaya authentication files on page 31
•
Mounting hardware in the rack on page 29
•
Configuring and connecting the hardware in the rack on page 30
•
Installing the media gateways on page 58
•
Installing the G650 Media Gateway
on page 64
•
Installing an MCC1 Media Gateway
on page 90
•
Installing the G350 Media Gateway
on page 127
•
Installing the G700 Media Gateway
on page 129
•
Installing the main distribution frame
on page 134
•
Connecting the media gateway to the main distribution frame
on page 149
•
Connecting to the customer’s network
on page 190
•
Installing and wiring telephones and trunks
on page 193
•
Connecting to the IP server interfaces
on page 181
•
Completing the installation administration
on page 246
•
Accessing the media server
on page 255
•
Testing the complete configuration
on page 263
•
Troubleshooting an installation
on page 287
Pre-installation setup
The pre-installation team should have done the following tasks. If they were not all done, do not continue
with the installation.
•
Verify that the open, customer-supplied, EIA-310D (or equivalent) standard 19-inch (48-
centimeter) equipment racks are properly installed and solidly secured. Make sure that the screws
that come with the racks are there.