![AuCom MVSxxxx-V02 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/aucom/mvsxxxx-v02/mvsxxxx-v02_user-manual_3006871025.webp)
INSTALLATION
Mounting Points
The power assembly is mounted in place using four M12 bolts. One bolt is required through each corner at the
base of the unit, tightened to a torque of 40 Nm. Individual phase arms are secured within the frame using one
M10 nut and two M10 high tensile grade 8.8 bolts complete with Belleville washers, all tightened to a torque of
28 ~ 30 Nm.
1
2
3
B
A
C
10130.
C
1
M10 bolts with belleville washers
2
M10 nut
3
M12 mounting holes
Plan view
Front of unit
Mounting Points (model V13)
For V13 models, the power assembly is mounted in place using eight M12 bolts (two bolts per side at 944 mm
centres). Individual phase arms are secured within the frame using two locking rods and two lock nuts, tightened to
a torque of 10 Nm.
MVS model V13 comes with a travel plinth. For installation the frame should be bolted into a panel with eight M12
bolts, tightened to a torque of 28 ~ 30 Nm.
Plan view
07236.
B
B
C
C
A
B
C
C
Front of unit
Measurements
A
mm (inch)
B
mm (inch)
C
mm (inch)
MVSxxxxV02
636
(25.04)
513
(20.20)
68.5
(2.70)
MVSxxxxV03
MVSxxxxV04
MVSxxxxV06
842
(33.15)
663
(26.10)
68.5
(2.70)
MVSxxxxV07
MVSxxxxV13
1150
(45.28)
944
(37.17)
103
(4.06)
NOTE
For models MVSxxxxV02 to MVSxxxxV04, these dimensions apply up to 321 A. For the same models with
current ratings of 500 A, the MVSxxxxV06 dimensions apply.
24
MVS Panel User Manual
710-13937-00C
Содержание MVSxxxx-V02
Страница 1: ......
Страница 89: ...APPENDIX 88 MVS Panel User Manual 710 13937 00C ...
Страница 90: ......