INSTALLATION
6.3
Fastening Panels to the Foundation
Switchgear panels must be fastened securely to a level floor which has been adequately prepared.
Soft Starter Panel (SSP)
It is recommended that all four bolt holes are used to securely bolt the panel to the floor using 10mm (0.39in) bolts.
140
96.
A
1
800
570
120
0
123
0
Plan view
1
Removable non-ferrous gland plate
Width
mm (inch)
Depth
mm (inch)
MVSxxxx-V02
MVSxxxx-V03
800 (31.5)
1200 (47.2)
MVSxxxx-V04
MVSxxxx-V06
MVSxxxx-V07
1000 (39.3)
1200 (47.2)
MVSxxxx-V13
710-13937-00C
MVS Panel User Manual
19
Содержание MVSxxxx-V02
Страница 1: ......
Страница 89: ...APPENDIX 88 MVS Panel User Manual 710 13937 00C ...
Страница 90: ......