On TELEMARK TT-3 control console:
10. Power “ON” the E-GUN PWR breaker for TT-3 supply.
11. Press TELEMARK TT-3 power supply, Main Power breaker “ON”.
12. Wait 5 minutes for (cut back) fans to spin up and stop flashing.
On TELEMARK sweep power supply:
13. Verify sweep controller power supply green light is on.
14. Make sure 5 interlocks green lights are on, e.g. Zero, Water, Doors, VAC and
Ready.
15. Switch CONTROL/SWEEP SELECT switch to “SWEEP SELECT” and
“AUTO” position.
16. Switch POWER SUPPLY CONTROLLER switch to “ON” position.
17. JOYSTICK/SWEEP CONTROL BOX: spiral/triangle/manual, switch to
“spiral”.
18. Pre-center E-Beam position using the “fine tune” button for position
adjustment and readouts from the LAT/LONG position.
On the master console touch screen panel:
19. Press “BACK” button to return “Menu” page.
20. Select “RECIPE” button.
21. Press “
↑
” or “
↓
” buttons for “RECIPE NUMBER” and “RECIPE NAME”
columns selection.
22. Make sure “PROCESS” number column is equivalent to “RECIPE