G
VENT TERMINATION CLEARANCES
A. Minimum 4-foot (1.22m) clearance below or beside any door or window that opens.
B. Minimum 1-foot (0.3m) clearance above any door or window that opens.
C. Minimum 3-foot (0.91m) clearance from any adjacent building.
D. Minimum 7-foot (2.13m) clearance from any grade when adjacent to public walkways.
E. Minimum 2-foot (0.61m) clearance above any grass, plants, or other combustible materials.
F. Minimum 3-foot (0.91m) clearance from an forced air intake of any appliance.
G. Minimum 2-foot (0.61m) clearance below eves or overhang.
H. Minimum 1-foot (0.3m) clearance horizontally from combustible wall.
I. Must be a minimum of 3 foot (0.091m) above the roof and 2 foot (0.61m) above the highest point or the roof within 10
feet (3.05m).
VENT TERMINATION CLEARANCES
Installation
9
Содержание Ashley AP5660
Страница 17: ...Installation SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk 17 ...
Страница 31: ...1 2 3 9 8 10 4 5 7 8 11 19 14 18 34 17 15 16 13 12 21 22 21 23 24 33 6 25 20 32 26 27 28 Parts Diagram 31 ...
Страница 33: ...Wiring Diagram 33 ...
Страница 35: ...Notes ...