FREESTANDING EXTERIOR VERTICAL INSTALLATION
1. Locate your Pellet Stove Room Heater in a location which meets the requirements of this manual, but in an area
where it does not interfere with the house framing, wiring, etc.
2. Install a non-combustible hearth pad underneath the pellet stove. This pad should extend at least 6” (152mm) in
front of the unit.
3. Place your Pellet Stove Room Heater on the hearth pad and locate the unit in a manner that will leave the exhaust
vent with a minimum of 3” (75mm) clearance to any combustible wall.
4. If installing the optional air intake, locate the center of the combustion air intake pipe at the back of your unit. Line
up the center with the same spot on your exterior wall and cut a 2-1/2” (64mm) diameter hole through the wall.
5. Secure all vent joint connections with 3 screws. Seal the exhaust vent joint connections with high temperature
silicone sealant.
6. Locate the center of the exhaust pipe, at the back of the unit. Line up the center with the same spot on the exterior
wall a cut a 7” (178mm) diameter hole through the wall.
7. Install the wall thimble; (refer to the instructions which come with the wall thimble).
8. Install an approved exhaust vent through the wall; be sure to make sure that 3” (75mm) clearances to combustibles
are maintained.
9. Secure all vent joint connections with 3 screws. Seal the exhaust vent joint connections with high temperature
silicone sealant.
10. Install a Tee with a cleanout on the end of the exhaust pipe and then install approved venting upward from there.
Be sure to install support brackets every 5’ (1525cm) to keep the venting straight and secure.
11. Extend the exhaust vent through the roof
fl
ashing and ensure that the vertical cap is approximately 36” (900mm)
above the roof.
Installation
Figure 11
Listed Termination
Flashing
36” (900 mm)
3” (75 mm)
Clearance
6” (150 mm)
Clearance
Wall Thimble
Tee
w/ Cleanout
Support Bracket
6” (150mm)
Non-Combustible
Floor Protection
Existing Combustible
Floor
Combustion Air Intake
with approved cap
14
Содержание Ashley AP5660
Страница 17: ...Installation SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk 17 ...
Страница 31: ...1 2 3 9 8 10 4 5 7 8 11 19 14 18 34 17 15 16 13 12 21 22 21 23 24 33 6 25 20 32 26 27 28 Parts Diagram 31 ...
Страница 33: ...Wiring Diagram 33 ...
Страница 35: ...Notes ...