
25
Citadel Bed Frame System
Drainage Bag Rails
The maximum weight that can be safely supported by each
drainage bag rail and DIN rail is 5 kg (11 lb).
Items placed on the drainage bag rails (such as patient drains
and urine bags) are included in the weighing calculation, and
can influence measurement of patient weight - see Weighing
Accuracy on page 38.
Rails (1) to support drainage bags, etc. are located below the thigh and backrest
sections on either side of the bed.
The bed may also be fitted with optional DIN accessory rails (2).
Figure 13: Drainage bag rails and DIN rail
Bed Length Adjustment
Install a suitable foam mattress extension (squab) at the foot end
when the bed is extended with a foam mattress.
Always adjust the bed frame and deck to the same length and
make sure both are latched securely in position.
Take care not to pinch your fingers when lifting the catch bar.
The length of the bed is adjustable to two set positions and an additional
transport position. These are typically used as follows:
1. Transport, for maneuvering the bed in confined spaces. No mattress
should be sized for this length as it is only to be used as a temporary
transport length, when necessary.
2. Standard length, for normal use. Sets deck length at 202 cm
(80 in).
3. Extended, to accommodate very tall patients. Sets deck length at 214
cm (84 in).
2
1
Содержание citadel
Страница 1: ...Citadel Bed Frame System Instructions for Use with people in mind 830 331 Rev A 08 2016 ...
Страница 72: ...72 Citadel Bed Frame System ...
Страница 73: ...73 Citadel Bed Frame System ...
Страница 74: ...74 Citadel Bed Frame System ...
Страница 75: ...75 Citadel Bed Frame System ...