Portable Test Equipment
User’s Guide
PTE-UGFW56a-EN
www.appliedp.com
50
Testing can be started or stopped by key
F1
. Voltage and current sensors have to be connected to
tested meter and optical sensor has to be adjusted to meters emitting LED or disc or impulse SO
cable has to be connected to device before start of testing.
5.5 Meter Readout
Meter Readout page enables to read content of registers of multifunctional meters with optical
communication interface according to IEC 62056-21.
Optical Communication head OPTH 1200 has to be connected to AUX input of the device and
properly placed to meter under test before starting data readout.
Meter Readout is initiated by
F3
key and result (content of registers of meter) is printed on display.
Readout data can be saved into database using key
F4
.
Meter Readout screen
* P48
Content:
(data)
............... Data from meter or error message
Control keys:
F1, ESC
........ Exit (return to previous page)
F3
........... Read data from meter
F4
........... Save data into database
F5
........... Menu
▼▲
........ Scrolling of readout data down and up
◄ ►
....... Scrolling of readout data left and right
PgUp, PgDn
......... Paging of readout data up
and down
5.6 Transformer Test
Test of current transformers (CT) or voltage transformers (VT) can be done after connecting of
suitable combination of current and voltage measuring sensors.
Testing of single phase transformer can be done using one three phase measuring accessory which
is connected to transformer this way: L1 channel of accessory to secondary side and L2 (or L3)
channel to primary side. Measurement screen shows result for both variants (L2/L1 and L3/L1).
Testing of three phase transformer (or also single phase transformer) can be done using two three
phase current sensors (in case of current transformer testing) resp. two three phase voltage sensors
(in case of voltage transformer testing). Channels of sensor connected into input A has to be
connected to secondary side of transformer and channels of sensor connected into input B has to be
connected to primary side of transformer.
It is possible to use any combination of current measuring accessories (CT 2x20, CC 2x12, CC 2x24,
FCP 3xxx) for Current Transformer testing.
Measurement
screens
depend
on
combination
of
connected
sensors
and
show:
nominal and measured Transmission Ratio, Transmission Error and measured Phase Error.
Содержание PTE 2100 Series
Страница 1: ...Portable Test Equipment Models PTE 2100 PTE 2300 User s Guide Version 5 6a ...
Страница 102: ...Portable Test Equipment User s Guide PTE UGFW56a EN www appliedp com 102 7 APPENDIX ...
Страница 104: ...Portable Test Equipment User s Guide PTE UGFW56a EN www appliedp com 104 Figure 22 3P3W Connection with OPTS ...
Страница 105: ...Portable Test Equipment User s Guide www appliedp com PTE UGFW56a EN 105 Figure 23 1P2W Connection with OPTS ...