2-1
Installation Verification
Service and Maintenance Procedures
129359-452, Volume 1
INSTALLATION VERIFICATION
2
An EQUIPMENT DRAWING showing all utility and space requirements was
sent to purchaser after order for this sterilizer was received. Clearance space
shown on the drawing is necessary for ease of installation and to assure proper
operation and maintenance of equipment. INSTALLATION and UNCRATING
INSTRUCTIONS were also furnished with sterilizer. If any of these documents
are missing or misplaced, contact STERIS giving the Serial, Equipment and
Model numbers. Replacement copies will be sent to you promptly.
2.1
Installation Checklist (See Figure 2-1)
After installing this unit according to instructions provided, complete the
following checklist to assure that your installation is complete and correct. Or,
if you desire, contact your STERIS representative for a technician to be
scheduled to test your installation and demonstrate proper equipment opera-
tion.
Shut-off valves, for maintenance purposes, installed in steam and water
lines at a point near the equipment.
Disconnect switch (with OFF position lockout) installed in electric supply line
near the sterilizer.
NOTE: If the equipment is installed next to other equipment, shutoff valves and
disconnect switches should be placed so that service can be shut off to any one
unit.
Service clearance is as shown on the EQUIPMENT DRAWING.
Leveling screws are correctly adjusted so that sterilizer is level and is at the
height shown on the EQUIPMENT DRAWING. To check, proceed as follows:
a. Place a spirit level on sterilizer end ring in door opening (side to side).
b.
Small Sterilizers
- Place level on right side of stand on underside of angle
supporting shell (running front to back).
Medium Sterilizers
- Place level on sterilizer end ring in door opening
(top to bottom).
If a recessed machine, panel trim fits tightly against curtain-wall opening.
Building steam line (direct steam units) provides condensate-free steam
between 97 and 100% saturated vapor and that pressure is as specified on
the EQUIPMENT DRAWING.
Building cold water line supplies water to sterilizer at the pressure specified
on the EQUIPMENT DRAWING.
Drain funnel is placed in the building waste line outlet (stubbing).
Electrical supply for sterilizer controls is as specified on the EQUIPMENT
DRAWING.
If furnished, rack is secure and shelves move freely in and out of chamber.
If applicable, building hot water line supplies water to electric generator of
sterilizer at the pressure specified on the EQUIPMENT DRAWING.
If applicable, electric supply for optional steam generator heaters is as
specified on the EQUIPMENT DRAWING. Circuit protection by others, not
supplied as part of the generator.
If applicable, disconnect switch for optional steam generator heaters is
installed in electric supply line near the sterilizer.