PN 9000-133-VE, Rev U
Replacing the Furnace
To replace the Furnace (Figure 3-7):
1. Open the analyzer and expose the analyzer components.
2. Close the isolation valves on the inlet and outlet of the process. Shutoff
levers should be in the vertical position.
3. Disconnect Cell furnace wires.
4. Remove the Thermocouple assembly from the furnace.
5. Remove the Cell.
6. Remove the Flow Sensor.
7. Loosen the Swagelok nut at the bottom of the furnace. Loosen the
Swagelok nut below the flow sensor.
8. Remove the Furnace assembly.
9. Install the new Furnace assembly in place.
10. Reinstall the Thermocouple, Flow Sensor, and Cell.
11. Reconnect the wires on the
Sensor
board.
Figure 3-7.
Furnace Assembly.
3-24 | Thermox
®
WDG-V / VC / VCM / VM
Содержание WDG-V
Страница 1: ...WDG V WDG VC WDG VCM WDG VM Combustion Analyzer USER MANUAL PN 9000 133 VE Rev U 5000 017 PI rA...
Страница 12: ...PN 9000 133 VE Rev U This page intentionally left blank xii Thermox WDG V VC VCM VM...
Страница 60: ...PN 9000 133 VE Rev U Figure 2 16 RCU Connections 2 34 Thermox WDG V VC VCM VM...
Страница 93: ...PN 9000 133 VE Rev U Figure 3 4 Thermocouple replacement Maintenance and Troubleshooting 3 19...
Страница 97: ...PN 9000 133 VE Rev U Figure 3 6 Flow sensor replacement Maintenance and Troubleshooting 3 23...
Страница 101: ...PN 9000 133 VE Rev U Figure 3 9 Combustibles Block Heater Replacement Maintenance and Troubleshooting 3 27...
Страница 103: ...PN 9000 133 VE Rev U Figure 3 10 Sensor board removal Maintenance and Troubleshooting 3 29...
Страница 124: ...PN 9000 133 VE Rev U This page intentionally left blank 4 10 Thermox WDG V VC VCM VM...