PN 9000-133-VE, Rev U
Installing the Sample Inlet Probe ..............................................................................................2-5
Standard 1/8" NPT Probe Installation ...............................................................................2-6
Ceramic Probe or Long Probe Installation .......................................................................2-7
Probe Heater Installation (Optional) ........................................................................................2-8
Installing the Exhaust Tube (Optional) ................................................................................. 2-10
Installing the Analyzer ............................................................................................................... 2-11
Methods for Mounting the Analyzer ...............................................................................2-11
Analyzer Flush Mounting (Preferred Method) .......................................................2-13
Customer-Supplied Pipe Nipple Analyzer Mounting ...........................................2-14
Customer-Supplied Flange Analyzer Mounting ...................................................2-15
Installing the Remote Calibration Unit (Optional) ........................................................... 2-16
Standard RCU Installation .................................................................................................2-16
Combustibles RCU Installation .........................................................................................2-18
Calibration/Aspirator Air ........................................................................................................... 2-20
Required Calibration Gases and Tubing .........................................................................2-20
Methane Span Gas .......................................................................................................2-20
Z-Purge Connections (Optional) ............................................................................................ 2-21
Z-Purge Shut-down Procedure .........................................................................................2-22
Aspirator and Manual Calibration Connections ............................................................... 2-23
Aspirator Air Connection ....................................................................................................2-23
Aspirator N
2
Connections ...................................................................................................2-23
Calibration Gas Connection ..............................................................................................2-24
AC Power and Signal Connections ................................................................................................ 2-25
General Wiring and Conduit Requirements ....................................................................... 2-26
WDG-V Mains Supply Connections .................................................................................2-27
EMC Grounding, Shielding and Noise Protection ............................................................ 2-28
EMC Grounding Method ....................................................................................................2-28
Transient and RFI Interference ..........................................................................................2-29
Current Output Connections ................................................................................................... 2-30
Standard Current Outputs .................................................................................................2-30
Alarm Contact Connections ..................................................................................................... 2-32
Standard Alarm Connections ...........................................................................................2-32
Remote Calibration Unit Connections (Optional) ............................................................ 2-33
Oxygen-Only Remote Calibration Unit Connections ..................................................2-33
Combustibles Remote Calibration Unit Connections .................................................2-33
Digital Input to Initiate Remote Calibration Unit .........................................................2-33
Digital Input to Initiate Remote Calibration Unit .........................................................2-35
Notes About Ducting ................................................................................................................. 2-35
Installing the User Interface/Communications Options ........................................................ 2-36
Installing the PC Configurator Software (Typical Communication Option) ........... 2-36
Setting the Analyzer Address Using the Dip Switch (to Enable
Communications Between the Analyzer and the PC Configurator Software) ......2-36
Connecting the PC to the Analyzer ..................................................................................2-37
Installing the AMEVision Display User Interface (Secondary Communication
Option)............................................................................................................................................. 2-38
iv | Thermox
®
WDG-V / VC / VCM / VM
Содержание WDG-V
Страница 1: ...WDG V WDG VC WDG VCM WDG VM Combustion Analyzer USER MANUAL PN 9000 133 VE Rev U 5000 017 PI rA...
Страница 12: ...PN 9000 133 VE Rev U This page intentionally left blank xii Thermox WDG V VC VCM VM...
Страница 60: ...PN 9000 133 VE Rev U Figure 2 16 RCU Connections 2 34 Thermox WDG V VC VCM VM...
Страница 93: ...PN 9000 133 VE Rev U Figure 3 4 Thermocouple replacement Maintenance and Troubleshooting 3 19...
Страница 97: ...PN 9000 133 VE Rev U Figure 3 6 Flow sensor replacement Maintenance and Troubleshooting 3 23...
Страница 101: ...PN 9000 133 VE Rev U Figure 3 9 Combustibles Block Heater Replacement Maintenance and Troubleshooting 3 27...
Страница 103: ...PN 9000 133 VE Rev U Figure 3 10 Sensor board removal Maintenance and Troubleshooting 3 29...
Страница 124: ...PN 9000 133 VE Rev U This page intentionally left blank 4 10 Thermox WDG V VC VCM VM...