Chapter 1 Hardware Installation
15
Step
Action
4
Install the fan/heat sink and press down. The installed CPU
fan and heat sink will appear as follows.
In
te
l
u
In
te
l
u
5
Attach the fan cable to the appropriate fan connector (JP1 for
the first CPU or JP2 for the second CPU). Latch the CPU
clip on both sides to the tabs on the CPU socket.
6
Install the voltage regulator (VRM module) in the socket
above each installed CPU, as shown below:
Cont’d
Содержание Goliath
Страница 1: ...Goliath PCI Quad Pentium Pro EISA System User s Guide MAN 730 6 7 96 ...
Страница 45: ......
Страница 71: ...Goliath PCI Pentium Pro EISA System User s Guide 66 ...
Страница 77: ...Goliath PCI Pentium Pro EISA System User s Guide 72 ...
Страница 78: ...Chapter 3 Programming the Flash ROM 73 A Mechanical Drawings ...
Страница 79: ...Goliath PCI Pentium Pro EISA System User s Guide 74 ...
Страница 80: ...Chapter 3 Programming the Flash ROM 75 ...