Cleaning, maintenance and repair
12.4
Service plan – overview
•
Carry out maintenance work when the first interval is reached.
•
The times, continuous services or maintenance intervals of any
third party documentation shall have priority.
After the first working run
Component
Maintenance work
see
page
Workshop work
Wheels
•
Wheel nut check
210
Hydraulic system
•
Check for leak tightness
214
Spraying pump
•
Check the oil level
223
On a daily basis
Component
Maintenance work
see
page
Workshop work
Whole machine
•
Visual check for faults
Fluid filter (Profi-folding)
•
Check the clogging indicator
217
If necessary, replace
X
Spraying pump
•
Cleaning, flushing
223
Spray liquid tank
182
Line filter in the nozzle lines
(if present)
230
Spraying nozzle
182
Brake
•
Drain air reservoir
207
Weekly / every 50 working hours
Component
Maintenance work
see
page
Workshop work
Hydraulic system
•
Check for leak tightness
214
X
Wheels
•
Check the air pressure.
210
Coupling device
•
Check for damage, deformation
and cracks
212
BAG0021.14 05.19
201
Содержание UG 2200 Special
Страница 237: ...Liquid circuit 13 1 UG Special BAG0021 14 05 19 237 ...
Страница 238: ...Liquid circuit 13 2 UG Super 238 BAG0021 14 05 19 ...
Страница 242: ...Spray table Fig 182 242 BAG0021 14 05 19 ...
Страница 251: ...Spray table BAG0021 14 05 19 251 ...
Страница 252: ......