![Amazone UG 2200 Special Скачать руководство пользователя страница 107](http://html1.mh-extra.com/html/amazone/ug-2200-special/ug-2200-special_operating-manual_2919780107.webp)
Construction and function of the sprayer boom
6.7
Folding via the tractor control unit
Preselected folding: depending on the equipment, you must press the
"fold sprayer boom" preselection button on the operating terminal
before activating tractor control unit
green
, in order to fold out the
sprayer boom.
Adjust spraying height
WARNING
Risk of crushing and impact for personnel who are caught while
the height of the sprayer boom is being raised or lowered.
Direct people out of the danger area of the machine before raising or
lowering the sprayer boom using height adjustment.
1. Direct people out of the danger area of the machine.
2. Set spraying height as per spray table via
•
Actuate tractor control unit
yellow
.
•
Operating terminal
( with Profi-folding).
Always align the sprayer boom parallel to the ground; only then can
the specified spraying height be achieved on all nozzles.
Folding out the sprayer boom
1. Actuate tractor control unit
yellow
.
→
Raise the boom to unlock it from its transport position.
2. Activate tractor control unit
green
until
→
Super-S: both boom packages are folded down
→
the individual segments are fully folded out
→
and
the
swing compensation is unlocked.
•
The appropriate hydraulic cylinders lock the boom in its working
position.
•
Folding out does not always happen symmetrically.
3. Actuate tractor control unit
green
→
Set the spraying height for the sprayer boom.
BAG0021.14 05.19
107
Содержание UG 2200 Special
Страница 237: ...Liquid circuit 13 1 UG Special BAG0021 14 05 19 237 ...
Страница 238: ...Liquid circuit 13 2 UG Super 238 BAG0021 14 05 19 ...
Страница 242: ...Spray table Fig 182 242 BAG0021 14 05 19 ...
Страница 251: ...Spray table BAG0021 14 05 19 251 ...
Страница 252: ......