System Requirements
AltiWare OE System Installation & Administration Manual
2-3
2
.
S
yst
em
Re
q
u
ir
eme
n
ts
Proper Grounding and Loop Current
Proper grounding is essential for any PBX system. This is a simple but
very important step and is highly recommended. Run a wire from the
server chassis to earth ground. Don’t wait for a problem to arise before
taking this step. Make sure this is one of the first things you do before
turning the AltiGen system on.
Also, check the loop current on incoming trunks before connecting to any
AltiGen boards. The desired loop current measurement is 25mA–28mA.
This is another essential step to ensure proper operation of AltiGen
systems. For more information on loop current issues, please refer to the
toolbox in the tech support section of AltiGen’s web site at
http://support.altigen.com.
Uninterruptible Power Supply (UPS)
Using a UPS prevents power fluctuations and surges on power sources
from utilities. Windows NT files can be corrupted as a result of power
failure or improper system shutdown.
Caution:
Corrupted files may not be repairable and may require re-
installation of Windows NT and AltiWare. To protect your
system from surges and power outages, it is strongly
recommended that an adequate UPS (providing between
600VA and 1000VA) and power surge protector is used
with the system.
Operating Environment
Before you set up and use the system, consider the environment in which
the system will reside:
•
Choose a work surface large enough to accommodate the entire
system.
•
Use a flat, stable work surface with enough space around it for proper
air circulation. For proper heat dissipation, a fan is recommended in
front of the AltiGen telephony boards to ensure sufficient airflow. Be
sure the fan filter is clean and does not block the airflow.
The following table contains the operating specifications for the AltiGen
telephony board.
Содержание AltiWare OE/ACC Version 5.0
Страница 134: ...Software Installation Troubleshooting 3 52 AltiWare OE System Installation Administration Manual...
Страница 184: ...Activity 5 38 AltiWare OE System Installation Administration Manual...
Страница 240: ...Configuring the Triton T1 E1 PRI Board 6 56 AltiWare OE System Installation Administration Manual...
Страница 264: ...Outgoing Call Blocking 7 24 AltiWare OE System Installation Administration Manual...
Страница 288: ...Phrase Management 9 14 AltiWare OE System Installation Administration Manual...
Страница 344: ...Setting Up Monitor Lists 10 56 AltiWare OE System Installation Administration Manual...
Страница 348: ...Configuration 11 4 AltiWare OE System Installation Administration Manual...
Страница 358: ...14 4 AltiWare OE System Installation Administration Manual...
Страница 364: ...Feature Tips 15 6 AltiWare OE System Installation Administration Manual...
Страница 414: ...Changing TAPI Configuration Parameters 19 4 AltiWare OE System Installation Administration Manual...
Страница 452: ...G 12 AltiWare OE System Installation Administration Manual...
Страница 467: ...Index AltiWare OE System Installation Administration Manual I 15 Index...
Страница 468: ...Index I 16 AltiWare OE System Installation Administration Manual...