
Liability & Warranty
AltiWare OE System Installation & Administration Manual
xxiii
Instructions for Hardwired Earth Connection
1.
A supplementary equipment earthing conductor is to be installed
between the product or system and earth, that is, in addition to the
equipment earthing conductor in the power supply cord.
2.
The supplementary equipment earthing conductor may not be smaller
in size (8 AWG minimum, recommend 6 AWG) than the unearthed
branch-circuit supply conductors. The supplementary equipment
earthing conductor is to be connected to the product at the terminal
provided, and connected to earth in a manner that will retain the earth
connection when the power supply cord is unplugged. The connection
to earth of the supplementary earthing conductor shall be in
compliance with the appropriate rules for terminating bonding jumpers
in Park K of Article 250 the National Electrical Code, ANSI/NFPA 70,
and Article 10 of Part I of the Canadian Electrical Code, Part I, C22.1.
Termination of the supplementary equipment earthing conductor is
permitted to be made to building steel, to a metal electrical raceway
system or to any earthed item that is permanently and reliably
connected to the electrical service equipment earthed.
3.
Bare, covered or insulating earthing conductors are acceptable. A
covered or insulating earth conductor must have a continuous outer
finish that is either green, or green with one or more yellow stripes.
4.
Earthing conductor shall not run through steel conduit.
UL Hardware Preparation
Prepare the hardware as follows ensuring that the relevant manufacturer’s
installation instructions are complied with. If you have doubts about any of
these, call your supplier.
1.
This apparatus must be professionally installed.
2.
Select a “CE” computer chassis according to the Safety Requirements
above, ensuring that it has an external marked earth point.
3.
The host machine ISA bus pins B1, B10 or B13 MUST be tested to
ensure that there is less than 0.1 Ohms to the earthing terminal.
4.
The host machine PCI bus pins complies with PCI Board
specifications Rev. 2.1 (5V 32-bit).
5.
Prepare the chassis, in accordance with the PC manufacturers
instructions, to receive the necessary PC cards, ensuring the
Содержание Altiware OE 4.5
Страница 2: ...AltiWare OE Version 4 5 System Installation and Administration Manual Revised 07 2002 4403 0001 4 5 ...
Страница 57: ...Key AltiServ Characteristics 28 AltiWare OE System Installation Administration Manual ...
Страница 117: ...Software Installation Troubleshooting 88 AltiWare OE System Administration Manual ...
Страница 129: ...Stopping the AltiGen Switching Service 100 AltiWare OE System Installation Administration Manual ...
Страница 169: ...Setting Logout Reason Codes 140 AltiWare OE System Installation Administration Manual ...
Страница 261: ...Setting Up Monitor Lists 232 AltiWare OE System Installation Administration Manual ...
Страница 283: ...Phrase Management 254 AltiWare OE System Installation Administration Manual ...
Страница 337: ...Changing TAPI Configuration Parameters 308 AltiWare OE System Installation Administration Manual ...
Страница 365: ...AltiWeb Security 336 AltiWare OE System Installation Administration Manual ...
Страница 375: ...Multisite Configurator 346 AltiWare OE System Installation Administration Manual ...
Страница 403: ...Advanced CallRouter 374 AltiWare OE System Installation Administration Manual ...
Страница 439: ...410 AltiWare OE System Installation Administration Manual ...