PAGE
18
ALMAC s.r.l.
2.4
Transport and loading
You are advised to check the dimensional limits established for means of
transport if the machine must be transported to its specific work site.
The machine can be loaded onto the vehicle in two different ways:
1)
Using appropriate ramps and the machine translation commands
: In this
case, make sure that the ramp gradient is within the gradeability indicated in
the PERFORMANCE data and that the bearing capacity of the chutes suits the
weight of the machine.
Note:
The machine has an advanced traction control function "
Direction-
Control
" (DC-S on the control panel) which allows it to be moved in a straight
line using a single joystick. It is advisable to use this operating mode with the
control stations in the maximum track width and in turtle mode, after aligning it
with the ramps.
2)
Lifting the machine
by forklift using the relevant tubular elements.
Note: Once the machine is positioned on the vehicle, secure it by means of
straps, connecting them to the appropriate holes on the frame.
Содержание MULTI-LOADER 6.0
Страница 39: ...PAGE 39 ALMAC s r l...
Страница 53: ...PAGE 53 ALMAC s r l...
Страница 110: ...PAGE 110 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Страница 112: ...PAGE 112 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 123: ...PAGE 123 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...