
PAGE
125
ALMAC s.r.l.
Batteries status verification ___________________________________________ 27
Replacement of individual batteries ____________________________________ 28
_________________________________________________ 30
DESCRIPTION OF THE MACHINE ____________________________________________ 32
__________________________________________________ 32
__________________________________________________________ 38
Mobile control push-button panel (console) ________________________________ 38
Ground control using the mobile push-button panel _________________________ 43
Ground controls _______________________________________________________ 43
____________________________________________________ 45
Main frame inclination control device _____________________________________ 46
Chassis tilt control device _______________________________________________ 46
YDRAULIC SYSTEM SAFETY DEVICES
______________________________________________ 47
Hydraulic pressure limiting devices _______________________________________ 47
Hydraulic block safety devices ___________________________________________ 48
_____________________________________________________ 51
External power source 230V or 110V ______________________________________ 51
12V-48V system ________________________________________________________ 51
LATFORM OPERATION DEVICES WHICH ARE NOT PART OF THE SAFETY SYSTEM
INSTRUCTIONS FOR USE _________________________________________________ 54
_____________________________________________________ 54
Suitability of the soil ___________________________________________________ 54
_________________________________________________________ 55
Powering of the machine. _______________________________________________ 55
Travel controls ________________________________________________________ 57
Standard travel mode ______________________________________________________ 59
Easy-Drive System (ED-S) ___________________________________________________ 60
Direct-Control System (DC-S)________________________________________________ 60
__________________________________________________ 61
_________________________________________________ 61
Machine levelling ______________________________________________________ 62
Automatic levelling ________________________________________________________ 63
Manual levelling __________________________________________________________ 63
Dynamic Levelling during travel _____________________________________________ 64
Dynamic Position System ___________________________________________________ 65
OSITIONING OF THE LOAD ON THE MACHINE
_________________________________________ 66
ESSAGES AND ALARMS ON THE HOUR COUNTER
______________________________________ 67
) _______________________________________________________ 70
Содержание MULTI-LOADER 6.0
Страница 39: ...PAGE 39 ALMAC s r l...
Страница 53: ...PAGE 53 ALMAC s r l...
Страница 110: ...PAGE 110 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Страница 112: ...PAGE 112 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 123: ...PAGE 123 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...