SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
129
Figure 61. Items Included with the AT-SBx81CFC960 Controller Card
Note
Store the packaging material in a safe location. You should use the
original shipping material if you need to return the unit to Allied
Telesis.
3. Carefully remove the controller card from the anti-static bag. Refer to
Figure 62. Removing the AT-SBx81CFC960 Controller Fabric Card from
the Anti-static Bag
4. Carefully remove the battery insulator tab on the controller card by
sliding it out from between the battery and battery clip, as shown in
Figure 63 on page 130.
One AT-SBx81CFC960
Control Card
One 2 m (6.6 ft) local
management cable with
RJ-45 (8P8C) and DB-9
(D-sub 9-pin) connectors.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...