Chapter 14: VCStack Plus Overview
276
Section III: Building a Stack with VCStack Plus
between the switches.
The bandwidth of the trunk is 40Gbps with four links and 80Gbps
with eight links.
Prior to AlliedWare Plus version 5.4.5 you had to use the AT-
StackOP/0.3 and AT-StackOP/9.0 stacking transceivers to build
the trunk of the stack. Starting with version 5.4.5 this restriction no
longer applies.
You do not have to replace the AT-StackOP/0.3 or AT-StackOP/
9.0 stacking transceivers if you are upgrading a stack to
AlliedWare Plus version 5.4.5 or later. The newer management
software is compatible with the stacking transceivers.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...