SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
109
3. Remove the new power supply from the shipping package and verify
the package contents, listed in Figure 43.
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
Figure 43. Items Included with the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC System Power Supply
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
Note
The tie wrap is used to secure the power cord to the chassis in
“Powering On AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC System
Power Supplies” on page 173.
One AT-SBxPWRSYS1 or
AT-SBxPWRSYS2 AC
System Power Supply
One regional AC power cord
One tie wrap
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...