Chapter 15: Building a Stack
306
Section III: Building a Stack with VCStack Plus
stack and its configuration file is used as the initial configuration for the
stack.
After the stack is operating, the active master card periodically shares its
configuration file with all the other controller cards in the stack. Thus, the
order in which the units are subsequently reset or powered on is not
important because all the controller cards have the same configuration file.
Powering On the
Switches
To power on the two chassis of the stack, do one of the following:
To power on AC AT-SBxPWRSYS1, AT-SBxPWRSYS2, and AT-
SBxPWRPOE1 PoE Power Supplies, connect the power cords to
the appropriate connectors on the back panel and to power
sources. For instructions, refer to “Powering On AT-
SBxPWRSYS1 or AT-SBxPWRSYS2 AC System Power Supplies”
on page 173 and “Powering On AT-SBxPWRPOE1 Power
Supplies” on page 177, respectively.
To power on the AT-SBxPWRSYS1 DC Power Supply, turn the
power switch to on. Refer to Figure 54 on page 121.
Be sure to power on all the power supplies in the chassis.
Note
To power on the two chassis in sequence to control the selection of
the active master controller card, power on the unit with the
controller card to be the active master controller card, wait a
minimum of ten seconds, and then power on the second unit.
The boot up sequence for the stack takes approximately four minutes. The
amount of time may vary, depending on the number and types of Ethernet
line cards in the two switches. The ports do not begin to forward traffic until
the stack has completed the initialization process. Do one of the following:
If you want to monitor the switches as they perform the initialization
process, go to “Monitoring the Boot Up Sequence” on page 306.
If you do not want to monitor the initialization process, go to
“Verifying the Stack” on page 309.
Monitoring the
Boot Up
Sequence
You may monitor the initialization process by connecting a terminal or PC
with a terminal emulator program to the Console port on any of the
controller cards and watch the status messages, shown in Figure 180 on
page 307 and Figure 181 on page 308. (The settings for the terminal or
terminal emulator program are found in “Using Local Management to
Verify the Chassis” on page 212.)
After the stack has completed the initialization process, go to “Verifying
the Stack” on page 309.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...