SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
101
Removing the Shipping Brace
Now that the chassis is installed in the equipment rack, you may remove
the shipping brace from the front of the unit. To remove the shipping brace,
remove the six mounting screws with a #2 Phillips-head screwdriver (not
provided). Refer to Figure 35.
Figure 35. Removing the Shipping Brace
After removing the shipping plate, go to “Installing the Chassis Grounding
Wire” on page 102.
Shipping Brace Screws
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...