SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
153
6. Connect the fiber optic cable to the port on the transceiver, as shown
in Figure 88. The connector should snap into the port.
Figure 88. Attaching a Fiber Optic Cable to an SFP+ Transceiver in the
AT-SBx81XS6 Line Card
7. Repeat this procedure to install additional SFP+ transceivers in the
AT-SBx81XS6 Line Cards.
After installing and cabling the SFP+ transceivers, do one of the following:
To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 9,
“Powering On the Chassis” on page 171.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...