SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
111
6. Lower the power supply locking handle to secure the power supply to
the chassis, as shown in Figure 46.
Figure 46. Lowering the Handle on the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC System Power Supply
Note
If the module does not fully seat in the chassis slot, check to be sure
you are installing a system power supply and not a PoE power
supply. The model name of the module is included on a label on the
locking handle. For more information, refer to “Power Supplies and
Power Supply Slots” on page 26.
7. To install a second system power supply, repeat this procedure.
8. After installing the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC
System Power Supples, do one of the following:
If you purchased the AT-SBxPWRPOE1 Power Supply for the
ports on the AT-SBx81GP24 PoE Line Cards, go to “Installing AT-
SBxPWRPOE1 PoE Power Supplies” on page 113.
Otherwise, go to Chapter 7, “Installing the AT-SBx81CFC960
Control Card and Ethernet Line Cards” on page 125.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...