17.
Hand tighten each nut.
a. Tighten the two rear nuts two turns.
b. Tighten the two front nuts two turns.
c. Tighten the two middle nuts firmly.
18.
Torque all the locknuts to 90 ± 9 ft.-lbs. – one after the other
– until all are tightened evenly and the machine is fastened se-
curely to the elevated base frame or floor.
80 Pound and Larger Models
19.
After the grout is completely cured, torque the locknuts to 150
± 15 ft.-lbs. – one after the other – until all are tightened even-
ly and the machine is fastened securely to the floor.
IMPORTANT: Refer to recommended grout cure
times from manufacturer before torquing locknuts.
NOTE: Check and retighten the locknuts after five to
ten days of operation and every month thereafter.
Acrylic Adhesive Anchors (refer to
Table 18
)
PHM811N_SVG
7
A
D
E
B
C
1
6
2
5
3
4
1.
Machine Frame Base
2.
Grout 0.5 in. [13 mm]
3.
Acrylic Adhesive
4.
Anchor Bolt (minimum Grade 5 SAE rating)
5.
Concrete
6.
Drill Hole Size per Manufacturer Requirements
7.
Edge of Pad
Figure 19
Installation
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
42
Part No. F8429301ENR15
Содержание SCB040GNF
Страница 2: ......