112
Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
Chapter 4
Frame B Field Controller Part Replacement Procedures
9. Slide the U and V phase bus bars that pass through the AC current
transducers up and out of the device.
10. Remove the screw and washer that secures each of the AC current
transducers to the device frame and remove the AC current transducers.
Install the AC Current Transducers
Install the AC current transducers in reverse order of removal.
• Note the color and location of each of the four wires that are connected
to the AC current transducers to ensure that each wire is properly
connected during installation. Use cable ties to bundle wires as shown
here.
10
Red wire
White wire
Blue wire
Black wire
Содержание 23PFC
Страница 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Страница 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Страница 142: ...142 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix B Circuit Board Layouts and Connections Notes ...
Страница 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Страница 149: ......