
104
Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
Chapter 4
Frame B Field Controller Part Replacement Procedures
7. Remove the two screws or bolts and washers that secure the (red and
blue) wires from the AC line snubber board to the terminal bus bars (C
and D) and remove the wires.
8. Remove the three bolts and washers that secure the (black) wires from
the resistors to the terminal bus bars (U, V, and W) and remove the
wires.
=
8
7
Bolt
Lock Washer
Flat Washer
Note the proper order of
washers for re-installation.
Содержание 23PFC
Страница 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Страница 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Страница 142: ...142 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix B Circuit Board Layouts and Connections Notes ...
Страница 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Страница 149: ......