Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
103
Frame B Field Controller Part Replacement Procedures
Chapter 4
Install the AC Line Snubber Circuit Board and Resistors
Install the AC line snubber board and resistors in reverse order of removal.
SCR Modules Replacement
Remove the SCR Modules
1. Read the General Safety Precautions on page
2. Remove power from the device (see page
3. Remove the screws and washers that secure the plastic shields to the
bottom of the device and remove the shields.
4. Remove the bolts, washers and wiring from the power terminals (U, V,
W, C, and D).
5. Remove the protective covers from the device (see page
6. Remove the pulse transformer and switching power supply boards from
the device (see page
). You do not need to remove the switching power
supply board from the back of the pulse transformer board for this
procedure.
IMPORTANT
Thermal grease must be applied to the bottom of the resistors before
securing them to the heat sink.
3
3
U Phase
V Phase
Bottom View
W Phase
D
C
4
IMPORTANT
Mark all connections and wires before removal to avoid incorrect
wiring during reassembly.
Содержание 23PFC
Страница 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Страница 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Страница 142: ...142 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix B Circuit Board Layouts and Connections Notes ...
Страница 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Страница 149: ......