Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
119
Chapter
5
Start-up after Repair
Before you apply power to a repaired device, perform the following tests:
•
•
Complete the Verify Field Controller Operation Connected to a Load as
detailed here.
Verify Field Controller
Operation Connected to a
Load
This procedure requires a HIM to configure and tune the device. If you prefer,
you can use the DriveExecutive™ software or Connected Components
Workbench® software.
1.
Verify that the input power wiring and grounding is connected.
2.
Verify that the power cables are connected to the load.
3.
Verify that the control and I/O wiring is correct.
4.
Verify that the control board DIP switches are set correctly. See Install the
Control Circuit Board on page
for more information.
5.
Verify that the protective covers are installed on the field controller.
6.
Apply power to the control circuits (terminals U2 and V2) of the device.
7.
Restore the field controller and communication adapter parameter
configuration using one of these methods:
•
Restore a saved HIM Set to the field controller.
•
Upload the field controller and adapter configuration from an offline
database file to the field controller by using DriveExecutive.
•
Import a device configuration file to the field controller by using
Connected Components Workbench software.
ATTENTION:
Power must be applied to the field controller to perform the
following start-up procedure. Some of the voltages present are at incoming line
potential. To avoid electric shock hazard or damage to equipment, only qualified
service personnel must perform this procedure. Thoroughly read and
understand the procedure before beginning. If an event does not occur while
performing this procedure,
Do Not Proceed. Remove Power
including user
supplied control voltages. Correct the malfunction before continuing.
Содержание 23PFC
Страница 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Страница 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Страница 142: ...142 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix B Circuit Board Layouts and Connections Notes ...
Страница 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Страница 149: ......