
Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
55
Frame A Field Controller Part Replacement Procedures
Chapter 3
13. Remove the cable from connector XUV on the left side of the switching
power supply board.
14. Remove the four M3 x 6 mm screws and washers that secure the
switching power supply board to the stand-offs on the back of the pulse
transformer board. Remove the switching power supply board.
15. Remove the plastic stand-off and nut that secures the switching power
supply board to the back of the pulse transformer board.
14
13
Torque Specification:
1.0 N•m (8.9 lb•in)
15
15
Содержание 23PFC
Страница 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Страница 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Страница 142: ...142 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix B Circuit Board Layouts and Connections Notes ...
Страница 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Страница 149: ......