64
ARTUS™ Technical Manual 9690348 v3_04_2020
Ins
ta
lla
tio
n
4 pipe heating
and cooling
4 pipe heating
and cooling
4 pipe heating
and cooling
4 pipe heating
and cooling
Glycol Circuit
Airedale (or third party) air-cooled chiller
Boiler /
Heat reclamation device
Plate heat
exchanger
2 pipe heating
only
2 pipe heating
only
2 pipe heating
only
2 pipe heating
only
Boiler /
Heat reclamation device
4 pipe heating
and cooling
4 pipe heating
and cooling
4 pipe heating
and cooling
4 pipe heating
and cooling
Glycol Circuit
Airedale (or third party) air-cooled chiller
Boiler /
Heat reclamation device
Plate heat
exchanger
2 pipe heating
only
2 pipe heating
only
2 pipe heating
only
2 pipe heating
only
Boiler /
Heat reclamation device
Recommended Pipework Installation - 2 Pipe Heating Only
Recommended Pipework Installation - 4 Pipe Cooling and Heating Changeover Coil
It is recommended that check valves are installed on the inlet legs of the 4 pipe cooling and heating
changeover system to prevent cross flow in the unlikely event of a PICV failure.
This is a simplified diagram. All the components highlighted in the Recommended Pipework
(External to Unit) section to be included on all circuits.
IMPORTANT
Key
2 pipe cooling
only
2 pipe cooling
only
2 pipe cooling
only
2 pipe cooling
only
Airedale (or third party) air-cooled chiller
Pump
Check Valve
ARTUS™
Comfort