Troubleshooting Operational Check Failures
Troubleshooting Operational Check Failures
If your test results fail the Operational Check limits, verify following:
1. Ensure that the Test Set is turned on and connected properly to the PNA.
2. Check all appropriate network analyzer and Test Set connectors for damage,
cleanliness, and proper torque.
3. Repeat the relevant 1-Port calibrations using another ECal or mechanical standard.
4. Verify that the stand-alone network analyzer is operating properly and meeting its
published specifications. Refer to
“Network Analyzer Requirement” on page 4
.
Interconnect Cable Verification
1. Connect the Test Set to the PNA and select Multiport mode.
2. Verify the Source Interconnect RF cables (Source Out and CPLR THRU).
a. Remove the Receiver and CPLR ARM interconnect cables and install the standard
PNA jumpers.
b. Connect an RF cable from Port 1 to Port 2 on the PNA.
c. Set the PNA to measure Trace S12 and S21 and verify that there are no power holes.
If S12 has a power hole check the Port-2 Source interconnect cables and Test Set
connectors for damage. If S21 has a power hole check the Port-1 Source interconnect
cables and Test Set connectors for damage.
3. Verify the Receiver Interconnect RF cables (Receiver A IN or B IN and CPLR ARM).
a. Re-install the Receiver and CPLR ARM interconnect cables.
b. Remove the Source Out and CPLR THRU interconnect cables and install the
standard PNA jumpers.
c. Connect an RF cable from Port 1 to Port 2 on the PNA.
d. Set the PNA to measure Trace S12 and S21, and verify that there are no power holes.
If S12 has a power hole check the Port-1 Receiver Interconnect cables and Test Set
connectors for damage. If S21 has a power hole check the Port-2 Receiver
Interconnect cables and Test Set connectors for damage.
4. If the problem still exists, connect the standard jumpers to the PNA (Source and
Receiver) and verify the Source Out to CPLR THRU and A/B IN to CPLR ARM switch
paths.
a. Set the PNA to measure trace S12.
b. Connect Port-1 to Source Out and Port-2 to CPLR THRU connectors on the Test Set.
If a power hole still exists refer to
“Contacting Agilent” on page 48
.
c. Connect Port-1 to Receiver A IN or B IN and Port-2 to CPLR ARM connectors on the
Test Set. If a power hole still exists refer to
“Contacting Agilent” on page 48
.