![Agilent Technologies U3025AE10 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/agilent-technologies/u3025ae10/u3025ae10_user-manual_2868216041.webp)
34
User’s Guide U3025-90001
U3025AE10
Operational Check Procedures
1-Port Calibration Procedure
1. Connect the ECal or the mechanical cal kit to Port 1 or the port you are testing. Torque
to 8 in-lb. Refer to
Figure 1 on page 2
. For more information refer to the system Help
menu.
2. Perform a 1-Port Calibration on Port 1. On the PNA, select
Response
>
Cal > Start Cal
> Calibration Wizard
.
a. If using a mechanical cal kit, select
SmartCal (Guided Calibration) > Next
.
b. If using an ECal module, connect the ECal to a PNA USB port. Select
Use Electronic
Calibration (ECal)
>
Next
.
3. Continue following the Cal Wizard prompts. In the Select Calibration Ports and ECal
Module dialog box press
Clear All
and select
Port 1
>
Next
and select
Measure
.
Figure 31
1-Port Calibration
4. Continue to follow the prompts until the “Calibration Completed” window appears.
5. At the Calibration Completed prompt select
Save As User Calset,
type the name
999.1
.
Overwrite the Calset if it already exists and
Save
.
NOTE
If you do not have a key board, select
Save As User Calset
>
Edit Name
and
save as
999.x.
X is the port number you are calibrating. Use the numeric
keypad on the PNA front panel to enter “999.1.”
Figure 32
Calibration Complete
This Manual:http://www.manuallib.com/agilent/u3025ae10-test-set-user-guide.html