![Agilent Technologies PL-GPC 220 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/agilent-technologies/pl-gpc-220/pl-gpc-220_user-manual_2867785045.webp)
PL-GPC 220 User Manual
45
Using the Module
4
Setting Up the PL-GPC 220
Setting Up the PL-GPC 220
Starting the Instrument
1
Switch on the solvent delivery module and wait until the alarm stops
sounding.
2
Ensure a capped vial is placed in the carousel before powering up the
instrument and the carousel is pushed fully in.
3
Switch on the main unit.
Again the beep will sound while the system initializes.
During the initialization process, the instrument will perform the following
tests:
•
Test the buzzer
•
Initialize the pump
•
Initialize the oven
•
Initialize the autosampler
•
Find zero vial
•
Raise vial into the oven
•
Purge the syringe
•
Lower the vial
•
Reset the syringe to the mid position
•
Toggle the injection valve 3 times
When the inialization process has completed, the instrument should be left
in the STANDBY (red light) mode with the pump and heaters off.
4
Launch the PL-GPC 220 Control software from the control PC.
5
Replace the columns by a barrel connector.
N O T E
When the instrument is first installed, this alarm may sound for up to 2 min while the vapor
sensor heats up.
Содержание PL-GPC 220
Страница 68: ...68 PL GPC 220 User Manual 6 Error Information Errors...
Страница 106: ...106 PL GPC 220 User Manual 8 Parts for Maintenance Pump Spares...
Страница 119: ......