Calibration
Procedure
1.
Press
4
Cal
5 .
2.
Press
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
CALIBRATE
MENU
.
3.
Turn
the
APC-7
R
connector
on
the
test
head
as
shown
in
Figure
4-5.
4.
V
erify
that
the
connector
sleeve
is
extended
fully
as
shown
in
Figure
4-6.
Figure
4-5.
Figure
4-6.
5.
Connect
the
0
S
termination
to
the
APC-7
R
connector
as
shown
in
Figure
4-7.
Figure
4-7.
6.
Press
NNNNNNNNNNNNNN
OPEN
.
After
an
OPEN
calibration
sequence
of
about
1
minute
,
the
NNNNNNNNNNNNNN
OPEN
softkey
label
is
underlined.
7.
Disconnect
the
0
S
termination.
4-6
Dielectric
Material
Measurement
Quick
Start
Содержание 4291B
Страница 20: ......
Страница 24: ...Figure 2 1 Contents 2 4 Installation and Set Up Guide ...
Страница 26: ...Figure 2 2 Agilent Part Numbers of Power Cables 2 6 Installation and Set Up Guide ...
Страница 34: ...Figure 2 7 Connecting a Keyboard 2 14 Installation and Set Up Guide ...
Страница 60: ......
Страница 104: ......
Страница 130: ......
Страница 152: ......
Страница 158: ......