Manipulator Manual of AIR20-A Industrial Robot
Project Maintenance Process
47
3.
Check the fixation between the cables and fixing plate for wear or
damage.
4.
Check the internal cables for wear or damage..
5.
In case of crack, wear or damage, please contact us for
replacement timely.
6.
Check if the lubricating grease on the internal cable surface has
disappeared.
7.
If so, it shall be replenished timely.
8.
The cable in the base to keep the shape "U" type like the figure Fig.
13-2.
9.
Install the cover plate, and coat the joint surface between the cover
plate and base with sealant
Fig. 13-2 Check and Repair for Internal Cables of J1 Joint Body
Check and Repair Process for Internal Cables of Big Arm
Check and Repair Process as follows:
1.
Remove elbow cable retaining plate as shown in Fig. 13-3.
2.
Pull out the cable and check whether the cable is reliably connected
to the fixed plate.
Electrical installation board
Screw M4X8
cable
stand