Section 2
Installation
Unpacking
Remove the 8150 Signal Chassis, Control Panel, and other equipment
from the shipping boxes. Inspect all articles for shipping damage. If you
find any, notify the shipping carrier immediately for claims adjustments.
Compare the contents against the packing list. Contact your Accom sales
representative if you find unexplained shortages.
Pre-Installation Checks
Signal Chassis
Remove the front cover and ensure the internal circuit board(s) is seated
in the Motherboard. Carefully inspect the Signal Chassis to ensure that
no parts were dislodged during shipping.
Control Panel
Carefully inspect the Control Panel to ensure that all buttons and knobs
are installed and secure.
Power Consumption
Signal Chassis
The 8150 Signal Chassis consumes less than 900 watts. Plug the 8150 into
a standard AC mains outlet.
Voltage Selection
The 8150 power supply automatically adapts to
the line voltage and frequency supplied (90 -
264 VAC, 47 - 63 Hz).
8150 Technical Guide
Unpacking
9100-0212-04 - May 2000
Installation
2-1
Содержание ASWR8150
Страница 12: ...Table of Contents 8150 Technical Guide X Contents 9100 0212 04 May 2000...
Страница 39: ......
Страница 80: ...Control Panel Connector Detail 8150 Technical Guide 2 40 Installation 9100 0212 04 May 2000...
Страница 109: ...Option Installation 8150 Technical Guide 3 30 Option Installation 9100 0212 04 May 2000...
Страница 236: ...8150 Partial Parts List 8150 Technical Guide A 6 Appendix 9100 0212 04 May 2000...