
SECO NDARY TESTING O F PROTECTIO N R ELAYS
SECO NDARY TEST S ETU PS
1VLG5000 17 C
71
Step 3/3
Simulate high currents on the current sensor input via the front voltage outputs 1, 2.
–
U1 = U2 with 180° phase shift (symmetrical source).
Simulate voltage on the voltage sensor input via the front voltage output U4, N.
–
U4 =
𝑈𝑛
√3
Figure 110: Setting of high voltage analogue outputs in the Test Universe program
Figure 111: Phasor diagram on the protection relay’s WebHMI
Figure 112: Measurements view
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...