
PRIM AR Y TESTIN G
CURRENT S ENSORS
1VLG5000 17 C
25
Step 6/6
Check current metering for the phase and the measured current in other phases on the pro-
tection relay LHMI Measurements view.
Current must be zero in all phases which are not under the primary injection test.
Figure 36: Measurements view
“Io-A” in Measurements view is a measured value, not a calculated one.
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...