PRIM AR Y TESTING
CURRENT S ENSORS
1VLG5000 17 C
21
Step 2/5
Move two neighboring circuit breakers into the service position and close them.
Default values of overcurrent, earth fault and unbalance protection functions can op-
erate the circuit breaker during primary injection. Disable all related protection func-
tions in the protection relay or disconnect the tripping coil (MO) from the negative
potential of power supply in the low voltage compartment before primary injection to avoid
unwanted tripping of the circuit breaker.
Step 3/5
In the cable compartments, connect the injection device to the cable sealing end of the same
phase.
Figure 31 Primary test setup for current sensors when busbars are installed
Step 4/5
Inject a current equal to the application nominal current or equal to the maximal current sup-
ported by the primary testing device if the application nominal current is out of the device
setting range.
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...