CURRENT S ENSORS
PRIM AR Y TESTING
28
1VLG5000 17 C
Step 6/7
Check current metering for the phase and measured current in other phases on the protec-
tion relay LHMI Measurements view.
Current must be zero in phases which are not under the primary injection test.
Figure 40: Measurements view
“Io-A” in Measurements view is a measured value, not a calculated one.
Step 7/7
After testing of all 3 phases, install the back-overpressure relief flap. Set up the Ith limiter and
verify its function in the switchgear panel.
Protection functions trip the signal block Tripping coil supervision function.
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...