
INTERLOCKS BETWEEN PANELS
APPAR ATUS CO NTRO L TESTING
56
1VLG5000 17 C
Step 7/10
On the protection relay LHMI (upstream circuit breaker) go to ->
Main Menu/Monitoring/
I/O status/Current protection/PHIPTOC1/Inputs
–
BLOCK = False
Figure 85: Deactivating blocking mode
Step 8/10
On the protection relay LHMI (tested feeder) go to ->
Main Menu/Test/IED test
–
Test mode = Normal mode
The ready LED is steady ON.
Figure 86: Entering test mode
Step 9/10
Repeat steps 3 to 8 for all feeders.
Step 10/10
On the protection relay LHMI (upstream circuit breaker) go to ->
Main Menu/Test/IED test
–
Test mode = Test off
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...