All circuit breakers in the relative section are in the test position. Check the circuit breakers
status via the protection relay LHMIs.
Figure 71: Single line diagram, the circuit breaker is in the test position
Step 2/4
Check the busbar earthing switch shutter. It can be open and the crank inserted.
Step 3/4
Fix the shutter in the open position.
Step 4/4
Check that no circuit breakers in the section can be moved out of the test position no more
than a half turn of the crank.
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...