
INTERCO NNECTIO NS
ETHER NET NETWOR K VER IFICATIO N
16
1VLG5000 17 C
Protection relay
Check the connection status of protection relays via PCM600. Open the factory delivered pro-
ject and select the protection relay for which you want to check the connection. If the connec-
tion between the PCM600 and protection relay is established, a green tick mark is shown
next to the protection relay icon.
Figure 24: Example of Plant Structure in PCM600
Network redundancy
Check the availability of voltage measurements and GOOSE signals when the managed Ether-
net switch, communication link or protection relay fails.
GOOSE and Process bus
The GOOSE / SMV alarm is assigned to a configurable LED via the PCM600 and it relates to
function blocks (GSELPRT1 – GOOSE supervision and ULTVTR1 – SMV supervision).
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...