When choosing the installation location and position, comply with the following conditions:
•
Install on a wall or strong structure capable of bearing the weight.
•
Install vertically with a maximum incline of +/- 5°. If the mounted inverter is tilted to an
angle greater than the maximum noted, heat dissipation can be inhibited, and may result
in less than expected output power.
•
Install in safe place where all switch handles and controls remain easy to reach and meet
height requirements of the applicable electrical code. Install at eye level so the display
and status LEDs can be easily seen.
• Ensure sufficient working area in front of the inverter to allow removal of the covers and
easy access for servicing the inverter.
•
When planning the installation, maintain clearance distances shown to allow normal
control functions and easy maintenance operations.
For multiple-inverter installations, position the inverters side-by-side, maintaining minimum
clearances. If the space available does not allow the side-by-side arrangement, multiple in-
verters can be placed in a staggered arrangement; this minimizes heat dissipation from lower
inverters affecting operation of other inverters.
Minimum clearances illustrated below include width of inverter plus additional allowances for
inverters arranged above or below.
6
in
8
in
6 in
6 in
UNO
Side-by-side arrangement
Staggered arrangement
6”
6”
25”
25”
25”
Содержание PVI-3.0-TL-OUTD-S-US
Страница 1: ...ABB solar inverters Product manual PVI 3 0 3 6 3 8 4 2 TL OUTD S US A 3 0 to 4 2 kW ...
Страница 16: ... 16 3005CC2 2 Installation location ...
Страница 32: ... 32 3007CC3 3 Mounting and wiring ...
Страница 62: ... 62 C011C5 5 Troubleshooting ...
Страница 66: ... 66 C012C6 6 Maintenance ...
Страница 72: ... 72 C013C7 7 Appendix Output power with one DC section operating ...