Preparation of the frame before refitting of gearbox axis 2
Use this procedure to make the necessary preparations of the frame before refitting
gearbox axis 2.
Note
Action
xx1000000379
Clean the
machined surface
in the frame as
shown in the figure, from paint, oil, corro-
sion coating or other kinds of contamination.
1
Parts:
•
A: Joint surface
•
B: Surface for o-ring
•
C: Machined surface
See figure above.
Clean the
joint surface
carefully, by remov-
ing old corrosion coating and/or flange
sealing from the surface.
2
See figure above
Clean the
surface for the o-ring
.
3
See figure above
Apply Mercasol on the
machined surface
.
Note
Make sure there is no Mercasol on the joint
surface!
4
Continues on next page
412
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.2 Replacing gearbox axis 2
Continued
Содержание IRB 6640 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 18: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 438: ...This page is intentionally left blank ...
Страница 448: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 486: ...This page is intentionally left blank ...
Страница 488: ...This page is intentionally left blank ...
Страница 495: ......